Projects
Recent work across healthcare, industrial, education, aquatic and transit projects in the UK, USA, Singapore and Italy.
IHSS Adanac Park
Read the case studyHealthcare, sterile services and aseptic pharmacy
Southampton, United Kingdom
Full MEP model, RIBA Stages 3, 5 and 6
Jurong Multipurpose Building
Read the case studyCommercial and industrial, 129,000 sq ft
Jurong, Singapore
Fire protection and ACMV, LOD 350
Bethesda Library and Community Center
Read the case studyPool piping and aquatic systems
Thompson’s Station, Tennessee, USA
Pool piping coordination, LOD 300 to 400
Tree House School
Read the case studyEducation, 39,000 sq ft
Pineville, North Carolina, USA
MEP, plumbing and fire protection, LOD 350
TTV Tramway, Termini to Tor Vergata
Read the case studyTransit and linear infrastructure
Rome, Italy
Electrical and civil utilities, LOD 400, 37 sub-lots
The full story behind each project
Our case studies explain what made each job difficult, what we did and what we delivered.
Have a similar project? Send us the drawings.
We’ll reply within one working day with questions, or with a scope and fee.
