1. IHSS Adanac Park

    Read the case study

    Healthcare, sterile services and aseptic pharmacy

    Southampton, United Kingdom

    Full MEP model, RIBA Stages 3, 5 and 6

  2. Jurong Multipurpose Building

    Read the case study

    Commercial and industrial, 129,000 sq ft

    Jurong, Singapore

    Fire protection and ACMV, LOD 350

  3. Bethesda Library and Community Center

    Read the case study

    Pool piping and aquatic systems

    Thompson’s Station, Tennessee, USA

    Pool piping coordination, LOD 300 to 400

  4. Tree House School

    Read the case study

    Education, 39,000 sq ft

    Pineville, North Carolina, USA

    MEP, plumbing and fire protection, LOD 350

  5. TTV Tramway, Termini to Tor Vergata

    Read the case study

    Transit and linear infrastructure

    Rome, Italy

    Electrical and civil utilities, LOD 400, 37 sub-lots

The full story behind each project

Our case studies explain what made each job difficult, what we did and what we delivered.

Have a similar project? Send us the drawings.

We’ll reply within one working day with questions, or with a scope and fee.