
IHSS Adanac Park, sterile services and aseptic pharmacy
We developed the complete MEP model from RIBA Stage 3 through Stage 5 construction coordination, then the Stage 6 as-built handover. HEPA ductwork, clean steam, medical gases, pure water and RO were coordinated through tight corridor ceilings.
- Sector
- Healthcare
- RIBA stages
- 3, 5 and 6
- Scope
- Full MEP model
- Software
- Revit, Navisworks




