What made each project difficult, what we did about it, and what we handed over.
IHSS Adanac Park
A high-specification healthcare facility on the Adanac Health and Innovation Campus, with a Sterile Services Department and an Aseptic Pharmacy unit needing cleanroom air quality and tight service routing.
The challenge: Narrow corridor ceilings full of clean steam, high-pressure gases and large ducts.
Read the case studyJurong Multipurpose Building
BIM modelling, coordination and construction documents for a 129,000 sq ft, five-level multipurpose building developed for JTC Corporation and ExxonMobil Asia Pacific.
The challenge: Inherited model out of step with 2D engineering redlines.
Read the case studyBethesda Library and Community Center
We were engaged to review and upgrade the pool piping model for the Bethesda Library and Community Center. The inherited LOD 300 model needed full detailing, multi-trade coordination, a constructability review and major design changes.
The challenge: A crowded pool plant room with large pumps, filters, tanks and headers.
Read the case studyTree House School
A 39,000 sq ft school known for its curved architecture, exposed glulam timber frame and acoustic classroom layouts.
The challenge: Curved walls making standard rectangular ductwork clash with soffits.
Read the case studyTTV Tramway, Termini to Tor Vergata
A tram line connecting Rome’s Termini station with the Tor Vergata university and medical district. We delivered LOD 400 modelling, clash coordination and documentation for the electrical and civil utility networks along the route.
The challenge: 37 sub-lots needing consistent naming and parallel delivery.
Read the case study